• No : 12045
  • Displayed Date : 2021/12/16 16:50
  • Print

How to handle the pump

Answer

Click the link to download.
 
1-1. Safety
   1) Safety precautions for bath filtration equipment
1-2. Installation
   1) Precautions for piping work of above-ground pumps
   2) Precautions for piping work of drainage pumps
1-3. Precautions before starting above-ground pump operation
1-4. Precautions for inverter operation
1-5. Instructions for downtime
1-6. Daily/periodic inspection
       -Daily Inspection Table
       -Scheduled Periodic Inspection
       -Part replacement cycle 
       -Pump inspection report format
1-7. Example of noise and vibration
1-8. Proposed noise prevention measures